STEP 1
Cell and architecture
CF-A PMMA CO₂RR Flow Cell, CF-T PTFE CO₂RR Flow Cell, CF-K PEEK CO₂RR Flow Cell or CZ Titanium Zero-Gap CO₂RR Cell. Choose the architecture and active area before specifying the surrounding equipment.
SSI · RESEARCH EQUIPMENT SELECTION
Define the complete equipment requirement around your experiment. This guide links the verified SSI cell and workstation portfolio and identifies the interfaces that need review.

You may need a cell and accessories, or a configured workstation. List the equipment you already have before requesting the complete scope.
Plan my CO₂RR setupSTEP 1
CF-A PMMA CO₂RR Flow Cell, CF-T PTFE CO₂RR Flow Cell, CF-K PEEK CO₂RR Flow Cell or CZ Titanium Zero-Gap CO₂RR Cell. Choose the architecture and active area before specifying the surrounding equipment.
STEP 2
Specify electrolyte, membrane type and cut dimensions, GDE, reference/counter electrodes, seals and wetted materials. Explore membrane materials; the final package and compatibility need confirmation.
STEP 3
Define CO₂ feed, gas-flow measurement/control, tubing and fittings, reservoirs, circulation and separation. Include flow ranges, connection sizes and pressure-management requirements in the enquiry. These components are not automatically included with a cell.
STEP 4
Share your existing potentiostat or power-source model, electrode mode, current/voltage requirements, connections and logging needs. Compatibility must be reviewed for the specific configuration.
STEP 5
If gas or liquid products will be analysed, identify the existing analyzer, sampling method, conditioning and communication requirements. An analyzer or calibrated analysis method is not implied by the cell purchase.
STEP 6
For a configured setup, discuss CW-B Benchtop CO₂RR Workstation or CW-A PLC/HMI Automated CO₂RR Workstation. Confirm the included cell, fluid handling, drive, sensors, controls, installation and analyzer interfaces as individual quotation items.
Include target experiment, electrolyte, active area, electrode/membrane configuration, electrical duty, gas/liquid requirements, existing instruments, analysis needs, budget range and timeline where known. SSI will review the scope; this guide is not an operating or safety procedure.
Source: SSI CO₂RR Flow Cells & Workstations brochure. Individual product pages identify their catalog references. Equipment, accessories and integration are quotation-specific.
Prepare my setup enquiry